Ready for transfer in July 2020, Mazarine Ratchayothin is a 37-story condominium project by Grand Unity. Phiphat Niyathirakool (4th from the left), Senior Director of Product Development and Design at Grand Unity Development Co., Ltd. or GRAND UNITY – SIMPLY MAKES SENSE, along with executives from quality contracting companies, including Thammachak Nantawitthayaporn (2nd from the left), Managing Director of Biucon Co., Ltd., Kijja Patmasattayasonti (3rd from the left), Managing Director of Chic Republic Public Co., Ltd., Surachat Chao-piemjit (5th from the left), Project Coordination Manager at THS Parking Solutions Co., Ltd., Somkiat Silwattanawong (6th from the left), CEO of Stonehenge Inter Public Co., Ltd., and Jakrapong Wongjareonsathit (7th from the left), Construction Control Director at Granit Construction Co., Ltd., came together to inspect the project and witness the successful construction of the 37-story residential building, located just 0 meters from the Green Line subway station at Ratchayothin. The Mazarine Ratchayothin - MAZARINE Ratchayothin project consists of 476 units valued at over 2.9 billion baht, ready for delivery to customers starting from July 2020.

The Mazarine Ratchayothin project is a 37-story residential building that offers convenience for all travel needs with the Green Line subway right at Ratchayothin station, designed with the concept “For Your Extraordinary Reasons - Discover the details of living for extraordinary reasons.” It features an impressive 3-story Triple Floor Sky Facilities area that includes a SHADE AND SHINE SKY POOL, a U-SHAPE saltwater swimming pool with both indoor and outdoor zones, offering panoramic city views, SKY FITNESS, and SKY LOUNGE with 360-degree views. There’s also a PARTY ROOM and EXCLUSIVE FOYER & BAR for private gatherings with friends, as well as a PRIVATE SALON, the only beauty salon in the Ratchayothin area. Additionally, for customers who enjoy driving but dislike searching for parking, the project offers an AUTO PARKING system with a total parking space of 70% throughout the project.